• LinkedIn Social Icon

© 2019 Interstate Highway Construction, Inc.

News Article

Design-Build Project Getting Underway on Pena Boulevard at Denver International Airport

July 31, 2019

 

On July 31, 2019, IHC was provided with the official Notice to Proceed on the Pena Boulevard (Phase 1 – Jackson Gap to Terminal) Design-Build project at Denver International Airport.

 

Our Denver Division is working with the owners’ group comprised of:

  • Atkins (PMT)

  • DEN Landside Engineering

  • DEN Stakeholders

 

We are excited for the opportunity to make this a successful project for the airport and relieve much of the traffic congestion that travelers currently incur while approaching the terminal!

Share on LinkedIn
Please reload

View the list of all news posts to browse more articles.

Follow Us
  • LinkedIn Social Icon

Have questions or need additional information? Visit our contact page for a list of contacts.