Airports

Constructing projects at commercial, military and private airfields.

Award-Winning Projects of All Sizes

IHC has constructed over 100 PCCP airfield projects in the last 20 years that have included work for 20+ separate airport authorities, military agencies or private fixed base operators totaling over $1 billion. Our projects have ranged in size from less than $1 million to greater than $100 million. We have won numerous local and national awards, including American Concrete Pavement Association awards for the "Best PCC Pavement Constructed in the USA" in Military/Commercial and General Aviation categories.

Airport Projects

Municipal Streets & Intersections (<30k SY), 2018, CO/WY ACPA

Allium Street is a limited access service road allowing vehicle traffic entrance to the east side of the airfield at Denver International Airport (DEN).  These roads are critical for airfield maintenance, fire fighting, and construction vehicles.  The existing asphalt was badly deteriorated, and the area adjacent to Taxiway EC was out of FAA compliance.  This project replaced the failed pavement and corrected the transverse grade issues.

Read more...

Concrete Pavement Restoration (CPR), 2018, CO/WY ACPA

Located on the west side of the Denver International Airport (DEN) Concourses, Taxiways F and G provide access to all west side Runways.  During winter months, they also provide access to critical Deice Pads.

Read more...

Lucas Drive’s half mile stretches between Middlebelt Road and East Service Drive at Detroit Metropolitan Wayne County Airport. The high daily wear and tear from serving rental car traffic had seriously deteriorated the pavement.

Read more...

Denver International Airport has implemented a program to repair the pavement around the gates. Over 20 years of use has resulted in deteriorated pavements and outdated fuel distribution and drainage systems. The GARDI SE project rehabilitated B gates 42, 44, 46, 48, 50, 52, 56, 58 and 60.

Read more...

The addition of gates B13 and B14 at Denver International Airport (DEN) included demolition of the existing pavements and construction of new pavement for aircraft parking with extension of the taxiway along the south side of Concourse B. Swinerton Construction was the prime contractor for the building construction and subcontracted the civil work to IHC.

Read more...

Commercial Service & Military Airports Award, 2017 OK/AR ACPA

Established in 1941 as a pilot training center, Vance Air Force Base supports approximately 70,000 aircraft operations each year.  Currently home to the 71st Flying Training Wing, Vance’s airfield pavements have endured a patchwork of diverse development through the years making it clear that major reconstruction was required.

Read more...

1 / 4

Please reload

Key Services

Roadways & Industrial Concrete

Portland Cement Concrete Pavement (PCC)

Roller Compacted Concrete (RCC)

Concrete Pavement Restoration

Concrete Joint Sawing & Sealing

Concrete Median & Wall Barrier

Please reload

Earthwork & Related Work

Demolition/Removals & Recycling

Excavation & Embankment

Soil Stabilization

Treated & Untreated Bases

Edge Drains, Trench Drains & Under Drains

Storm, Water & Sewer

Rip Rap, Grouted & Ungrouted

Please reload

Ready Mix & Flowfill

Ready Mix & Flowfill Producer

Please reload

Structures

Box Culverts

Utility Inlets, Manholes & Drainage

Foundation Structures

Glycol Ponds

Please reload

Construction Management

Design/Build

Complex Schedule Management

Subcontractor Management

Contractor Quality Assurance

Traffic Control

Please reload

Recent Project News

Have questions or need additional information?